en

    Construction

    Design and installation organization, 15 years of experience in design; construction; assembly, installation and adjustment of technological equipment, electrical devices and automation systems in various industries.

    We use our own production units, storage and transport resources, design and development center. This allows you to significantly reduce the risk of the Customer and fulfill the contractual obligations with high quality and on time.

    Construction, installation and design work

    Construction, installation and design works
    When performing work, “OKA” uses its own production units, warehouse and transport resources, and a design and development center. This approach allows you to significantly reduce the risk of the Customer and fulfill contractual obligations efficiently and on time.

    Provides the following services:

    • Preparation of technical tasks for design and collection and preparation of source data.
    • Development of sections of the power supply system, communication networks, fire safety measures and solutions for automation of technological processes of the project documentation in accordance with the requirements of decree No. 87 of the Government of the Russian Federation.
    • Development of working documentation for electrical sections, ATC and ACS sections, low-current systems, hydraulic and lubrication systems.
    • Author’s supervision of compliance with the requirements of project documentation during construction.
    • Performs the adaptation of foreign projects to the requirements of Russian normative documents.

    Human resources

    The total number of employees of the company is 250 highly professional specialists. 200 workers, 50 engineers and technicians.

    Projects

    JSC "SUEK" sh. "Severnaya" JSC "Urgalugol"

    Engineering, selection of the entire equipment complex and delivery of a conveyor line consisting of 2 belt conveyors with a width of 1600 mm and a capacity of 5000 t / h. Multi-drive machines are equipped with frequency converters. All conveyors are equipped with a sensor system that allows you to monitor and track the technical condition of the main components

    JSC "SUEK", sh. " Taldinskaya-Zapadnaya-1"

    Engineering, selection of the entire equipment complex and delivery of a conveyor line consisting of 4 belt conveyors with a width of 1600 mm and a capacity of 3500 t / h. Multi-drive machines are equipped with frequency converters. All conveyors are equipped with a sensor system that allows you to monitor and track the technical condition of the main components.

    JSC "SUEK", sh. "Taldinskaya-Zapadnaya-2"

    Engineering, selection of the entire equipment complex and delivery of a conveyor line consisting of 3 belt conveyors with a width of 1600 mm and a capacity of 3500 t / h. Multi-drive machines are equipped with frequency converters. All conveyors are equipped with a sensor system that allows you to monitor and track the technical condition of the main components.

    SUEK-Kuzbass JSC

    Engineering, production and delivery of "turnkey" 2-x radial dumpers with a capacity of 4000 tons / hour, 35 m long boom, 210o turning angle.

    Our partners

    Get more information about the company

    Contacts

    Office:

    St. Petersburg, 9 Kurchatov street, Litera V.

     

    Phone:

    +7 (812) 633-08-01